Google Compute Engine Machine Type c4d-highcpu-64

General-purpose Google Compute Engine machine type c4d-highcpu-64 with 64 vCPU and 120 GB memory. Available in 12 Google Cloud regions.

โœ… Instance Picker with filter on machine type c4d-highcpu-64 Compare machine type c4d-highcpu-64

Google Cloud VM c4d-highcpu-64

Technical facts about the Google Compute Engine machine type c4d-highcpu-64.

Series C4D
Family General-purpose
vCPU 64
Memory 120 GB
CPU Manufactur AMD
CPU Platform
  • AMD Turin
CPU Base Frequency 2.7 GHz
CPU Turbo Frequency 3.5 GHz
CPU Max. Turbo Frequency 4.1 GHz
EEMBC CoreMark Benchmark (?) -
EEMBC CoreMark Standard Deviation -
EEMBC CoreMark Sample Count -
SAP Standard Benchmark (?) -
Network Bandwidth 45 Gbps
Network Tier 1 75 Gbps
Max. Disk Size 257 TB
Max. Number of Disks 32
Local SSD โŒ Optional
SAP Application โŒ
SAP HANA โŒ
Spot Provisioning Mode (Spot VM) โœ”๏ธ
Sustained Use Discount (SUD) โŒ
GCE API Description 64 vCPUs, 120 GB RAM

Costs (Pricing) for c4d-highcpu-64

Cost and pricing across all regions for Google Cloud VM c4d-highcpu-64.

Price per Hour

Min. Avg. Max.
Standard price per hour 2.5125 2.7544 3.2265
Spot provisioning model (Spot VM) 1.001 1.0974 1.2855

Price per Month

Min. Avg. Max.
Price per month 1834.12 2010.7 2355.38
Spot provisioning model (Spot VM) 730.75 801.11 938.43
1 year commitment (CUD) 1155.5 1266.74 1483.89
3 year commitment (CUD) 825.35 904.81 1059.92

Operating System Licenses Costs

Monthly costs for paid premium operating system licenses for Google Compute Engine machine type c4d-highcpu-64.

Operating System Month 1Y CUD 3Y CUD
Microsoft Windows Server 2149.12
SUSE Linux Enterprise Server 80.3
Red Hat Enterprise Linux 504.58 504.58 504.58
SUSE Linux Enterprise Server for SAP 299.3 119.94 107.75
Red Hat Enterprise Linux for SAP 759.2 759.2 759.2

Price per Region

Costs and pricing for Google Compute Engine machine type c4d-highcpu-64 in Google Cloud regions in which the VM is available. Between the most expensive and the cheapest region is a price difference of 22%.

Region Location #Zones #Platf. Hour Spot Month 1Y CUD 3Y CUD
us-central1 Iowa ๐Ÿƒ 3 1 2.5125 1.001 1834.12 1155.5 825.35
us-east1 South Carolina 2 1 2.5125 1.001 1834.12 1155.5 825.35
us-east4 Northern Virginia 3 1 2.5125 1.001 1834.12 1155.5 825.35
us-west1 Oregon ๐Ÿƒ 2 1 2.5125 1.001 1834.12 1155.5 825.35
asia-south1 Mumbai 2 1 2.613 1.0411 1907.48 1201.72 858.37
europe-west4 Netherlands ๐Ÿƒ 3 1 2.6381 1.0511 1925.83 1213.27 866.62
europe-west1 Belgium ๐Ÿƒ 1 1 2.7665 1.1022 2019.55 1272.32 908.8
us-west4 Las Vegas 2 1 2.8298 1.1275 2065.77 1301.44 929.6
europe-west2 London ๐Ÿƒ 2 1 2.8642 1.1412 2090.9 1317.26 940.9
europe-west3 Frankfurt ๐Ÿƒ 2 1 2.9647 1.1812 2164.26 1363.49 973.92
asia-southeast1 Singapore 3 1 3.0997 1.235 2262.75 1425.54 1018.24
asia-northeast1 Tokyo 2 1 3.2265 1.2855 2355.38 1483.89 1059.92