Google Compute Engine Machine Type n4d-highmem-32

General-purpose Google Compute Engine machine type n4d-highmem-32 with 32 vCPU and 256 GB memory. Available in 13 Google Cloud regions.

โœ… Instance Picker with filter on machine type n4d-highmem-32 Compare machine type n4d-highmem-32

Google Cloud VM n4d-highmem-32

Technical facts about the Google Compute Engine machine type n4d-highmem-32.

Series N4D
Family General-purpose
vCPU 32
Memory 256 GB
CPU Manufactur AMD
CPU Platform
  • AMD Turin
CPU Base Frequency 2.7 GHz
CPU Turbo Frequency 3.5 GHz
CPU Max. Turbo Frequency 4.1 GHz
EEMBC CoreMark Benchmark (?) -
EEMBC CoreMark Standard Deviation -
EEMBC CoreMark Sample Count -
SAP Standard Benchmark (?) -
Network Bandwidth 32 Gbps
Network Tier 1 -
Max. Disk Size 512 TB
Max. Number of Disks 128
Local SSD โŒ Optional
SAP Application โŒ
SAP HANA โŒ
Spot Provisioning Mode (Spot VM) โœ”๏ธ
Sustained Use Discount (SUD) โŒ
GCE API Description 32 vCPUs, 256 GB RAM

Costs (Pricing) for n4d-highmem-32

Cost and pricing across all regions for Google Cloud VM n4d-highmem-32.

Price per Hour

Min. Avg. Max.
Standard price per hour 1.3531 1.8875 2.1937
Spot provisioning model (Spot VM) 0.5011 0.746 0.8986

Price per Month

Min. Avg. Max.
Price per month 987.75 1377.88 1601.4
Spot provisioning model (Spot VM) 365.77 544.55 655.95
1 year commitment (CUD) 621.79 867.94 1009.17
3 year commitment (CUD) 443.75 620.1 721.39

Operating System Licenses Costs

Monthly costs for paid premium operating system licenses for Google Compute Engine machine type n4d-highmem-32.

Operating System Month 1Y CUD 3Y CUD
Microsoft Windows Server 1074.56
SUSE Linux Enterprise Server 80.3
Red Hat Enterprise Linux 252.29 252.29 252.29
SUSE Linux Enterprise Server for SAP 299.3 119.94 107.75
Red Hat Enterprise Linux for SAP 379.6 379.6 379.6

Price per Region

Costs and pricing for Google Compute Engine machine type n4d-highmem-32 in Google Cloud regions in which the VM is available. Between the most expensive and the cheapest region is a price difference of 38%.

Region Location #Zones #Platf. Hour Spot Month 1Y CUD 3Y CUD
asia-south1 Mumbai 3 1 1.3531 0.5011 987.75 621.79 443.75
us-central1 Iowa ๐Ÿƒ 4 1 1.7789 0.7846 1298.58 818.04 584.47
us-east1 South Carolina 3 1 1.7789 0.644 1298.58 818.04 584.47
us-east4 Northern Virginia 3 1 1.7789 0.7667 1298.58 818.04 584.47
us-east5 Columbus 3 1 1.7789 0.7114 1298.58 818.04 584.47
us-west1 Oregon ๐Ÿƒ 3 1 1.7789 0.644 1298.58 818.04 584.47
europe-west4 Netherlands ๐Ÿƒ 3 1 1.869 0.676 1364.36 858.9 612.85
europe-west1 Belgium ๐Ÿƒ 3 1 1.9575 0.8441 1429 900.79 643.44
us-west4 Las Vegas 3 1 2.0041 0.8012 1462.97 921.3 658.62
europe-west2 London ๐Ÿƒ 1 1 2.027 0.7338 1479.74 932.59 666.55
europe-west3 Frankfurt 1 1 2.1002 0.8396 1533.12 965.24 690.01
us-west3 Salt Lake City 1 1 2.1387 0.8526 1561.22 983.29 702.38
asia-southeast1 Singapore 3 1 2.1937 0.8986 1601.4 1009.17 721.39